With its versatile fleet, MCS is capable of the installation of Subsea Umbilicals Risers and Flowlines (SURF) in the most challenging locations.
Take for example the Kirinskoye Project. For this condensate field located 28 km off the eastern coast of Sakhalin Island, in Sea of Okhotsk, the scope of work required the installation of:
- 28 km 4,5’’ MEG pipeline
- 20’’ gas collecting pipeline
- two 10’’ flowlines (including ILTs and PLETs)
- umbilicals
- manifold